Cable car Babin do - top of Mt Bjelašnica

Short description:
The construction of the cable car Babin do - the top of the Mt Bjelašnica, in two sections. The bottom station (section 1) is at 1,282 m, and the top station (section 2) is at 2,067 m, the speed of 6 m/s. The transport capacity is 2,400 persons/hour, corresponding to the long-term development strategy of the ski center of Mr Bjelasnica. The construction is according to the latest technical and technological solutions that offer maximum safety to the users, and it is very important that the projects is aesthetically integrated into the natural environment and that it complies with all European standards in terms of ecology.
 

Funds needed: 24,300,000.00 KM
 

Available project documentation:
- Feasibility study
- Cost-benefit analysis
- Environmental impact analysis
- Environmental permit, town planning approval, deforestation appoval, the major project.